Inspection Report
Summary
Severe damage to engine bay, turbo, engine, hoses, cab struts, cab insulation & cab paintwork. Fire appears to have started in turbo area. The vehicle continued to run when on fire & water was pumped through the turbo & into the engine before it stopped. There is probable internal engine damage from debris / water. Wiring loom burnt and no tests have therefore been carried out. Smoke damage to interior parts, seats carpets, headlining. The rear cement delivery tube (Auger) is driven off the gearbox power take off which only works with the engine running. The pipe is blocked with solid cement. Please see the attached photos for a visual indication of condition.
The unit is fully loaded & the location dont have equipment to remove the load. Gross weight is currently approx 38 tonnes. If required the location can assist with dragging the unit out of its current location and pushing onto a low loader but have advised that this may cause further damage to the machine.
The unit is fully loaded & the location dont have equipment to remove the load. Gross weight is currently approx 38 tonnes. If required the location can assist with dragging the unit out of its current location and pushing onto a low loader but have advised that this may cause further damage to the machine.
Condition
|
Additional Photos
Important Information
Notices
Brexit Information for Buyers - click here
After the lot closes, the Seller will decide either to accept or reject the high offer. If the Seller accepts, an invoice will be issued and the lot will transact. If the Seller rejects, the Buyer will be notified and there will be no sale. A Seller award decision is expected within 5 business days of the close date.
After the lot closes, the Seller will decide either to accept or reject the high offer. If the Seller accepts, an invoice will be issued and the lot will transact. If the Seller rejects, the Buyer will be notified and there will be no sale. A Seller award decision is expected within 5 business days of the close date.
Payment Details
-
Within 7 days after the auction, the buyer must submit full payment, including applicable taxes and fees to avoid late fees.
For this item, payment is due on or before
31 August . - Payment can be made by wire transfer.
- All bids cannot be retracted and are binding until 2 business days after the auction ends. Failure to make full payment will result in a Default Fee.
Final Selling Price | Transaction Fee |
Above £1 | 10% of the final selling price |
Shipping & Pick Up Details
-
Brexit Information for Buyers - click here
- Item must be picked up within 8 business days of the auction, or the buyer will incur storage charges.
Pickup Terms
Failure to follow these terms may result in the seller turning away the attempt of your driver to pick up the purchased item(s).
You must call at least 24 hours in advance to schedule pickup
Driver MUST bring a copy of the IronPlanet Item Release to pick the item up.
Failure to follow these terms may result in the seller turning away the attempt of your driver to pick up the purchased item(s).
You must call at least 24 hours in advance to schedule pickup
Driver MUST bring a copy of the IronPlanet Item Release to pick the item up.
Questions
Customer Care Agents are available Monday to Friday, 8 a.m. to 5 p.m. (Brisbane Time) |
||
Phone | 1300 139 344 or +61 7 3382 4444 if outside Australia | |
Fax | +61 7 3382 4433 | |
CustomerCare@ironplanet.com.au |