Previous Next
Sold on
24/08/18
# of Bids
41
ITEM DETAILS

 

Inspection Report


Summary
Severe damage to engine bay, turbo, engine, hoses, cab struts, cab insulation & cab paintwork. Fire appears to have started in turbo area. The vehicle continued to run when on fire & water was pumped through the turbo & into the engine before it stopped. There is probable internal engine damage from debris / water. Wiring loom burnt and no tests have therefore been carried out. Smoke damage to interior parts, seats carpets, headlining. The rear cement delivery tube (Auger) is driven off the gearbox power take off which only works with the engine running. The pipe is blocked with solid cement. Please see the attached photos for a visual indication of condition.

The unit is fully loaded & the location dont have equipment to remove the load. Gross weight is currently approx 38 tonnes. If required the location can assist with dragging the unit out of its current location and pushing onto a low loader but have advised that this may cause further damage to the machine.


Condition
SalvageSale - The goods, unless stated otherwise, should be viewed as salvage and therefore have a likelihood of being damaged or substandard and may not be fit for purpose, please refer to the description above for more details. No warranties are expressed or implied. Please ensure that you read and agree to the specific SalvageSale Terms and conditions that can be found by clicking on the “Terms & Conditions” link at the bottom of this page.
Description Rating Details  
Condition After the lot closes, the Seller will decide either to accept or reject the high bid. If the Seller accepts, an invoice will be issued and the lot will transact. If the Seller rejects, the Buyer will be notified and there will be no sale. A Seller award decision is expected within 2 business days of the close date.
Removal (i) This Item is being sold AS IS WHERE IS. NO customs, export, or import assistance is available from our Company, the Seller, or the Storage Location. Our Company, Seller, and Storage Location expressly disclaim the appropriateness of this item to be exported from, or imported to, any country. Shipping, logistics, transportation, loading, customs, export, and import activities, and all associated costs, are the sole responsibility of the Winning Buyer.
Removal (ii) Buyers are required to examine all items prior to removing from the location. If the items differs significantly from how it was represented in the lot description, the Buyer must contact Customer Care before removing.
Removal (iii) Removal Deadline: 8 days after the invoice is generated. Unclaimed items beyond the removal deadline are subject to additional fees and forfeiture unless the winning buyer makes specific arrangements with the storage location.
Extended Bidding In the event that a bid is placed in the last 3 minutes of the auction close time, then the auction will be subject to 3 minutes extended bidding until there is no bid for a full 3 minutes.


Additional Photos
(28)